An AE Program Management &
Structural Engineering Company
16121 N. Meadowdale Rd
Edmonds, WA 98026
ph: 425.745.9926
alt: 206.351.2217
brian
Location: Wasco, CA and Delano, CA Size/ Cost: $92 Million.
Location: 1840 S. Mesa Dr , Mesa, AZ - 2 Story + freestanding pylon
Location: 500 S. Marina St , Prescott, AZ
Location: Frank Lloyd Wright's Marin County Civic Center Complex Size/Cost: 84000 sq ft $35 Million
Location: Avondale, AZ Size/Cost: 2-story
Location: South of Phoenix Intl Airport- 16 underground vaults and junction structures with varying surcharge and hydrostatic water levels.
Work Performed: Annual Special Structural Inspection and Report.
Sulfide Control Station: Pump House and Containment Basin.
Recker Transfer Station:Screen walls, Slab, underground meter vault
City Of Edmonds : Structural Plan Review* Worked Performed: ( Residential/Commercial)Structural plan review of approximately 40+, mainly residential plans submitted to the city each year for permit. (This included training city personnel in structural plan review, which gradually assumed more and more of the city struct plan reviews.)
Location: "A" street between 11th and 12th St. , Tacoma, WA
Location: Bellevue, WA
Work Performed: Foundation design for pre-engineered metal building.
Work Performed: Commercial, Institutional and Residential Structural Plan reviews
Work Performed: Mezzanine change of use load Study
Work Performed: Structural Design and detailing for pre-engineered metal building, interfacing with existing concrete walls and foundations for Vactor Corral
Work Performed:
Work Performed: Commercial, and Complex Residential Structural Plan reviews
* Performed while employed at previous firm WJA/Tetratech
` Performed while employed at previous firm DMJM
^Performed while employed at previous firm Coffman Engineers Inc
Copyright 2009 SCBC Engineering, PLLC.. All rights reserved.
16121 N. Meadowdale Rd
Edmonds, WA 98026
ph: 425.745.9926
alt: 206.351.2217
brian