Ocean Wonders Shark Aquarium: Coney Island, NY: SCBC Principal Brian Moll worked alongside MLA Structural team in the Structural Design of this complex aquarium project. ECC $150 Million, 58,000SF.
http://porticogroup.com/portfolio/aquariums/new_york_aquarium_shark_exhibit
World Dressage Complex - Covered Equestrian Arena Wellington, Florida design-build pre-engineered metal building project for an 80,400 SF open air dressage arena built in hopes of attracting the 2018 World Equestrian Games. Foundation design, detailing and construction support. Designed for 140 MPH Wind Speed.
Manatee County Myakka Child Care and Community Center: Myakka, Florida Size/ Cost: ECC $1.0 Million, 1 story, 4500 sq ft,
Costco Docklands- Melbourne, Australia SCBC Principal worked as part of the Mulvanny G2 | Seattle Structural team for Costco's first wholesale store to be constructed in Australia. Size/ Cost: $34 Million, 2 story, 150,700 sq ft.
Bank of America-Western Washington Data Processing Center ^ Renton, WA Size/ Cost: $12.0 Million, 1 story, 36000 sq ft, Structural Slab Courtyard 7350 sq ft.
Bank of America- Industrial Sorting Center^ Gresham, OR Size/ Cost: $6.5 Million, 1 Story, 20750 sq ft.
Fillmore Center` Fillmore District, San Francisco, CA Size/ Cost: (2) 7 Story and (1) 10 Story, multiuse cast-in-place concrete setback buildings+ landscape structures.
Phoenix Newspapers Inc` Deer Valley, AZ Size/Cost: $40 Million, 2 Story +High bay with Mezzanine, 280000 sq ft .
Cabelas- Greenwood^ Greenwood, Indiana Size/Cost: $24.3 Million, 1 Story, 139300 sq ft [435x320].
Cabelas- Wheatridge^ Wheatridge, Colorado Size/ Cost: $32.2 Million, 2 Story, 185000 sq ft [300x320].
West Elm- Millenia^ Orlando, Florida Size/ Cost: $4.2 Million, 1 Story, 18000 sq ft .
29th St Development-Parking Garage^ Tacoma, WA. Size/ Cost: $25 Million, 4 Stories, 660000 sq ft [240x635] . Project Halted @ 75% design.
Lakemont Medical/Dental Office Bldg * Bellevue, WA Size/ Cost: $3+ Million, 2 stories above parking level, 12000 sq ft parking, 23400 sq ft office.
Plateau Professional Center * Sammamish,WA Size/ Cost: $2+ Million, 3 stories 14000 sq ft .
Pacific Marine Management Hangar* Sun Valley (Hailey), ID Size/ Cost: $4.5 Million, 1 Story, 29000 sq ft. plus 1000 sq ft mezzanine.
Edgewater Townhomes * Lake Chelan, WA Size/ Cost: (4) 2 story units above concrete parking level garage, Project Un-built.
Calvert Services Inc Drying/Storage Building* Maltby, WA Size/ Cost: $6.0+ Million, 1 Story, 43300 sq ft.
Covered Bridge* Stanwood, WA Size/ Cost: $120K, 63 ft main span.
LDS Church addition ~ Thatcher, AZ Work performed: Structural design of major additions.
Ramblewood North Condominiums~ Phoenix, AZ Size/ Cost: 3 story wood framed condominiums.
Single Family Residence*
Annie Meadows Residence: $300K, 3 Story, 2800 sq ft., Seattle,WA
Moll Residence: $250K, 3 story, 2000 sq ft., Edmonds, WA.
Richards Residence: structural condition assessment and strengthening, Sammamish, WA.
Mantooth Residence: Balcony addition, conservatory feasibility study. Edmonds,WA.
Dan Callan Residence: New deck and hanging support system. Seattle, WA
Kevin Callan Residence: Westside addition and seismic strengthening. Seattle, WA.
Malmstrom AFB Family Housing phases 3, 4, and 6, Malmstrom, AFB Montana: design of new 3 and 4 bedroom single family residences.
Tradewinds Development, Phoenix, AZ : House plans C1625, C1003, C2312, and C1443. ~
Value Analysis/Constructibility Studies^ *
- Tacoma Community College Health and Wellness Center: Constructability Study
- Sunnyside School District Elementary School Replacement Constructability Study
- Bellingham School District Happy Valley Elementary School Constructability Study
- Kennewick School District Southridge Middle School Constructability Study
- Clover Park Lakeview Elementary School Constructability Study
- North Thurston School District Middle School #5 Constructability Study
- Airfield Operations Complex at Joint Base Lewis-McChord. Facilities studied include an Air Traffic Control Tower, a Regional Flight Center and a Fire Station.
- Peninsula College Allied Health/ Child Care Facility: Value Analysis Study
- Renton Technical College Auto Complex: Value Analysis Study
- Tacoma Community College Health and Wellness Center: Value Analysis Study
- Lake Stickney Elementary School: Value Analysis Study
- Delta High School: Value Analysis Study
Kenmore Junior High:Value Analysis Study
Woodland Elementary School: Value Analysis Study
Nisqually Middle School:Value Analysis Study
LakeRidge Middle School: Value Analysis Study
N. Kitsap High School: Value Analysis Study
Amgen AW12-LAR: Value Engineering Study
Woodland Elementary School: Constructibility Study
Lake Washington School District:Finn Hill Jr High Modernization Value Analysis Study
Kennewick School District-Cottonwood Elementary School: Constructibility Study
Kennewick School District-Canyonwood Elementary School: Constrctibility Study
Hudtloff Middle School: Value Engineering Study
Helen Keller Elementary School: Value Engineering Study
Pasco School District-Elementary School #13: Value Engineering Study
Seismic Evaluation-Rehabilitation/ Condition Assessments
King County 420 4th Ave, Seattle Facility Condition Assessment
Puget Sound Yacht Club: Facility Condition Assessmnent
Edmonds Public Facilities District: Edmonds Center for the Arts Seismic Study
Spinnaker Apt Complex, Kirkland, WA:Structural evaluation and seismic upgrade.*
Puget Sound Christian College, Edmonds, WA: Tier 1 Seismic screening of entire campus and accompanying report.*
Hoyt Garage, Everett, WA: Tier 1 seismic screening/report.*
126 West Estates, Everett, WA: Condition Assessment letter.*
Federal Aviation Administration-Lind Ave SW, Renton, WA: Tier 1 seismic screening/report.^
City of Edmonds Frances Anderson Center: Tier 1 seismic screening/ report.*
1736 4th Ave South, Seattle, WA: $1 Million, 1 Story with mezzanines, 20000 Sq ft, Structural Design and detailing to FEMA 356/ ASCE 41 to permit submittal.
- USPS Tacoma Downtown Station: Tier 1 seismic screening.
Industrial Facilities^ *
Boeing retaining wall:Boeing Office Complex, Everett, WA. Combined depressed roadway retaining wall at overpass.
Boeing Tooling Facility, Bldg 1710 Auburn,WA: Seismic Evaluation of existing structure, Mech equipment support, mezzanine, full height draft wall.
Texaco Tumwater/ Texaco Anchorage: Bottom loading rack canopies, pipe supports, foam building
Boeing Boiler plant bldg 3-374/ Boeing paint hangar Bldg 3-369: Seismic evaluation, Mech Equipment support, addition design
Boise Cascade re-roof, Boise Cascade Mill, Steilacoom, WA:Floating new rigid bent supported roof over existing failing trussed roof below.
City of Rainier- Tank Foundation
Texaco TRMI- Tank Foundation
Chip transfer conveyor and Incline chip conveyor, Clarkston, WA: Design of conveyor supports and foundations.
Boeing Boiler and fuel jet pads/Walkways, Boeing North Field, Seattle, WA: Mat Foundation, Containment Structure and elevated platforms.
Holnam Inc, Seattle, WA: Stormwater detention tank, and Kiln pier #5 study.
Weyerhauser, Everett, WA: Foundation design for pre-engineered metal building.
Pederson Bros-Seattle, WA:Extended end plate moment frames for fabricator on industrial project.
Mountain Bell remote switching module, Wintersburg, AZ: design foundations for pre-engineered metal building
Tenant Improvement/ Remodel^ *
Nordstrom Rack-Cleveland, OH: Entry Portal
Nordstrom-Santa Anita, CA: Entry Reconfiguration Seismic Implications
Cabelas Xanadu- East Rutherford, NJ: Entry Portal,Column Wraps, Operable partitions/Slider supports, opening framing.
Nordstrom Arden Fair: Heavy soffit evaluation and detailing
Nordstrom Glendale: Remodel
- Nordstrom Horton Plaza - San Diego: Remodel
Nordstrom Rack- Danvers MA: Remodel
Nordstrom Rack- Bergen Town Center, NJ: Remodel
Nordstrom Rack- Topanga: Remodel
- 6th & Pike Building: Stair infill
Sammamish Office Building: Curved soffit design and building signage support.
Skagit Valley Square-Mount Vernon, WA: Design and detailing of storefronts from conversion of enclosed mall to exterior strip mall.
Southern Palm center Remodel, Tempe, AZ: Reinforce openings placed in existing shear walls.~
West 1st St. Restaurant, Mesa, AZ: Historic houses reconfiguration into restaurant.~
McDonalds E Broadway, Tucson,AZ: Patio lanai and patio addition~
Load Investigations/Studies^ *
FAB13:Structural Analysis of heavy file placement in new TI work.
McDonalds Touchstone:Structural Analysis of heavy file placement in new TI work.
High Density File Loading:Structural Analysis of heavy file placement in new TI work.
Bank of Tokyo:Structural Analysis of safe placement in new TI work.
Emerald Queen Casino: Structural study of lateral stability.
Wall Street Bldg. everett,WA:Structural Analysis of heavy file placement in new TI work.
Nordstrom Southshore: Two way slab study
Nordstrom Walnut Creek: Two way slab study
Cardon Oil Convenience Markets~
Brown & Higley Rd, Mesa, AZ.
67th Ave & McDowell Phoenix, AZ.
7th St & Baseline, Phoenix, AZ.
59th Ave & Olive, Phoenix, AZ.
Apple Blossom & Iron Springs Rd, Prescott, AZ.
* Performed while employed at previous firm WJA/Tetratech
` Performed while employed at previous firm DMJM
^Performed while employed at previous firm Coffman Engineers Inc
~ Performed while employed at previous firm Banner Associates Inc